As part of the MCC Phase II property preservation plan, Popli Design Group's (PDG) renovations and additions to various buildings across MCC’s Brighton Campus included the theater renovation that included replacement of an antiquated 550-seat fixed seating layout, redesigned for wheelchair seating and exiting guidelines. We also performed a point cloud and acoustical analysis of the space, and completed an entire interior redesign. 

During the design development phase, I worked on several preliminary project charrettes and schemes. I also detailed a complex retrofit to an existing non-compliant three-story spiral staircase and designed interior elevation patterning at the aisles, the back of the theatre, and the theater control booth.